中文字幕av专区_日韩电影在线播放_精品国产精品久久一区免费式_av在线免费观看网站

溫馨提示×

溫馨提示×

您好,登錄后才能下訂單哦!

密碼登錄×
登錄注冊×
其他方式登錄
點擊 登錄注冊 即表示同意《億速云用戶服務條款》

Incorrect Cost for WIP Assembly Return 1

發布時間:2020-08-09 22:21:36 來源:ITPUB博客 閱讀:171 作者:chenshm329 欄目:大數據
Incorrect Cost for WIP Assembly Return 1

Incorrect Costs For Wip Assembly Return To Discrete Job Using Average Costing (文檔 ID 788680.1) Incorrect Cost for WIP Assembly Return 1

In this Document


Symptoms

Changes

Cause

Solution

References


Applies to:

Oracle Cost Management - Version 11.5.10.2 to 12.1.3 [Release 11.5 to 12.1]
Information in this document applies to any platform.

Symptoms


Find using the average cost method and our orgs are Project Manufacturing enabled. WIP Assembly returns to a job are supposed to be costs at the average unit value for completions from that job.
Material was issued to the job in the AUG-08 period at $2,774.81 and the job was fully completed (8 ea) at the same total cost in the same period.
In the following period (SEP-08), OSP resource costs of $1800 were received to the job. In an attempt to absorb this additional cost, all 8 were returned using the WIP Assembly return
transaction then all 8 were completed again using WIP Assy Completion transaction. Oracle costed the WIP assembly return at $0 cost.
This is incorrect. It should have returned 8 at $2,774.81 for a unit cost of $346.85. Then, the 2nd WIP assembly completion was costed at $4,574.81 ($2,774.81 + $1800) Essentially, the $2,774.81 material cost on the job was absorbed to inventory twice

EXPECTED BEHAVIOR
Expect ...8 returned at $2,774.81 for a unit cost of $346.85

-- Steps To Reproduce:
The issue can be reproduced at will with the following steps:
1. Open a standard discrete job in a manufacturing org using average cost method.
The routing should have an OSP resource requirement. the BOM should have one costed material component.
2. Issue material to the job and fully complete the job in one accounting period.
3. Close the accounting period
4. Receive OSP resource costs in the next period.
5. Do a WIP assembly return of all quantity completed. Then, do another final WIP assy completion

Changes

 

Cause

Code Issue

The material costs incurred against some operations (new operations) were not being relieved through the completion transactions

Solution

EBS 11.5.10.X

-- To implement the solution, please execute the following steps:


1. Download and review the readme and pre-requisites for Patch 7520866

bom  patch/115/sql  CSTLCACB.pls  115.6.115100.6 
bom  patch/115/sql  CSTLCASB.pls  115.3.115100.4 
bom  patch/115/sql  CSTPACCB.pls  115.17.115100.12 
bom  patch/115/sql  CSTPACSB.pls  115.8.115100.8


You can use the commands like the following:
strings -a $BOM_TOP/filename |grep '$Header'

5. Retest the issue.

6. Migrate the solution as appropriate to other environments.

---------------------------------------------------------------------


EBS 12.1.X

To implement the solution, please execute the following steps:


1) Please download and review the readme for Patch 11805897:R12.BOM.C


2) Please apply Patch 11805897:R12.BOM.C in a test environment.


3) Please confirm the following file versions:
CSTPACCB.pls 120.8.12010000.8
CSTPACSB.pls 120.2.12010000.4
CSTLCACB.pls 120.2.12010000.4
CSTLCASB.pls 120.1.12010000.3


4) Please retest the issue.


5) If the issue is resolved, please migrate the solution as appropriate to other environments.


向AI問一下細節

免責聲明:本站發布的內容(圖片、視頻和文字)以原創、轉載和分享為主,文章觀點不代表本網站立場,如果涉及侵權請聯系站長郵箱:is@yisu.com進行舉報,并提供相關證據,一經查實,將立刻刪除涉嫌侵權內容。

AI

义马市| 鸡西市| 县级市| 根河市| 连平县| 若尔盖县| 娱乐| 景东| 赫章县| 上栗县| 余江县| 曲沃县| 庆云县| 内丘县| 同心县| 廉江市| 军事| 汝南县| 天峻县| 鄄城县| 陇川县| 娄烦县| 益阳市| 镇原县| 吴桥县| 东明县| 衡阳市| 宾阳县| 会同县| 毕节市| 曲阜市| 涡阳县| 虞城县| 高安市| 宁化县| 中牟县| 萝北县| 海城市| 昂仁县| 华容县| 巴马|